Bring Your Knitwear Ideas to Life — Fast.
From tech pack to finished prototype in 3–5 days, and bulk production as fast as 2–3 weeks with our optimized sampling workflow, 3D development tools, and experienced technical team.
Why Speed Matters in Knitwear Production
Today’s fashion cycles move quickly — brands must launch new styles, react to trends, and restock fast-selling items without delay. Fast sampling and quick-reorder capability gives you:
Faster time-to-market
Lower risk through quick prototyping
Ability to test multiple designs
Rapid replenishment for best-sellers
Stronger reaction to seasonal trends
Our factory is engineered specifically to support high-speed sampling without compromising quality, even for complex knitwear designs.
Our Fast Sampling Capability
20+ Years Sampling Masters
Our sampling team is led by technicians with 20+ years of experience in sweater engineering, fit correction, gauge tuning, and finishing. They understand:
Tension behavior of different yarn counts
How to compensate for washing shrinkage
How to stabilize rib structures
How to balance oversized vs. regular measurements
This experience ensures that your first sample is already close to production quality.
Global Size Chart Expertise (US / EU / Asia)
We are fully familiar with global sizing systems for men, women, and kids, including:
US retail fit
EU boutique fit
UK department store measurements
Japan / Korea slim-fit standards
This minimizes revisions and ensures your sample fits the target market correctly.
Yarn Sourcing in Under 2 Hours
With over 20 trusted yarn suppliers, we can secure material within 2 hours, including:
Cotton, acrylic, polyester blends
Wool, merino, cashmere, alpaca
Performance yarns (anti-pilling, stretch)
Seasonal yarns (brushed, boucle, nep, mohair-like)
We keep large quantities of stock yarn colors, enabling same-day sample knitting.
Smooth Sampling Workflow (Built for Speed)
Our sampling process is structured to eliminate delays:
Tech Pack or Reference Sample Submission
We accept sketches, photos, tech packs, or physical samples.Yarn & Gauge Confirmation
We select the closest yarn count and gauge for your design.Knitting & Linking
Our dedicated sampling machines (3G–12G) run independently from bulk lines.Washing & Finishing
Controlled washing for accurate shrinkage is done in-house for speed.Measurements & QC
We inspect fit, tension, surface stability, and color.Revision If Needed
Usually only 1 revision is required due to experienced technicians.
Total time: 3–7 days depending on complexity and yarn type.
Case Studies: Alabama School Alumni Knitwear — Urgent Sample for Marketing
100% cotton sweater,polo,dresses
Customer Requirement
Alabama school alumni sweater
Must match official school colors
1 sample needed for marketing photos
Extremely tight deadline
Provided design picture + size chart
Sampling Process (3 Days)
Day 1: Reviewed design and size, matched school colors, created knitting data.
Day 2: Knitted, linked, washed, and adjusted for fit and color accuracy.
Day 3: Final QC, finishing, and packing for UPS expedited shipping.
Express Delivery
We shipped the sample via UPS Expedited, ensuring it reached the customer on time for their alumni marketing event.
Customer Outcome
Sample arrived before the deadline
Colors perfectly matched the school’s identity
Used immediately in marketing photos and alumni promotions
Customer plans to move forward with bulk orders
FAQ — Fast Sampling & Quick Reorder
3–7 days depending on the style and yarn availability.
Yes. We can develop samples from sketches, photos, or reference garments.
Yes, we support US, EU, UK, and Asian size standards.
If yarn is in stock, 2–3 weeks; with fresh yarn, about 3–4 weeks.
Jacquard, intarsia, and cable can still be sampled within 5–7 days.