Bring Your Knitwear Ideas to Life — Fast.

From tech pack to finished prototype in 3–5 days, and bulk production as fast as 2–3 weeks with our optimized sampling workflow, 3D development tools, and experienced technical team.

Why Speed Matters in Knitwear Production

Today’s fashion cycles move quickly — brands must launch new styles, react to trends, and restock fast-selling items without delay. Fast sampling and quick-reorder capability gives you:

  • Faster time-to-market

  • Lower risk through quick prototyping

  • Ability to test multiple designs

  • Rapid replenishment for best-sellers

  • Stronger reaction to seasonal trends

Our factory is engineered specifically to support high-speed sampling without compromising quality, even for complex knitwear designs.

knitting master experts 20 years experience
yarn pre processing
linking knitwear
knitwear production

Our Fast Sampling Capability

20+ Years Sampling Masters

Our sampling team is led by technicians with 20+ years of experience in sweater engineering, fit correction, gauge tuning, and finishing. They understand:

  • Tension behavior of different yarn counts

  • How to compensate for washing shrinkage

  • How to stabilize rib structures

  • How to balance oversized vs. regular measurements

This experience ensures that your first sample is already close to production quality.

knitting master experts 20 years experience
knitwear size chart

Global Size Chart Expertise (US / EU / Asia)

We are fully familiar with global sizing systems for men, women, and kids, including:

  • US retail fit

  • EU boutique fit

  • UK department store measurements

  • Japan / Korea slim-fit standards

This minimizes revisions and ensures your sample fits the target market correctly.

Yarn Sourcing in Under 2 Hours

With over 20 trusted yarn suppliers, we can secure material within 2 hours, including:

  • Cotton, acrylic, polyester blends

  • Wool, merino, cashmere, alpaca

  • Recycled & sustainable yarns

  • Performance yarns (anti-pilling, stretch)

  • Seasonal yarns (brushed, boucle, nep, mohair-like)

We keep large quantities of stock yarn colors, enabling same-day sample knitting.

knit yarns (2)

Smooth Sampling Workflow (Built for Speed)

Our sampling process is structured to eliminate delays:

  1. Tech Pack or Reference Sample Submission
    We accept sketches, photos, tech packs, or physical samples.

  2. Yarn & Gauge Confirmation
    We select the closest yarn count and gauge for your design.

  3. Knitting & Linking
    Our dedicated sampling machines (3G–12G) run independently from bulk lines.

  4. Washing & Finishing
    Controlled washing for accurate shrinkage is done in-house for speed.

  5. Measurements & QC
    We inspect fit, tension, surface stability, and color.

  6. Revision If Needed
    Usually only 1 revision is required due to experienced technicians.

Total time: 3–7 days depending on complexity and yarn type.

Case Studies: Alabama School Alumni Knitwear — Urgent Sample for Marketing

100% cotton sweater,polo,dresses

fast sampling case study (2)
fast sampling case study (3)
fast sampling case study (4)
fast sampling case study (1)

Customer Requirement

  • Alabama school alumni sweater

  • Must match official school colors

  • 1 sample needed for marketing photos

  • Extremely tight deadline

  • Provided design picture + size chart

Sampling Process (3 Days)

  • Day 1: Reviewed design and size, matched school colors, created knitting data.

  • Day 2: Knitted, linked, washed, and adjusted for fit and color accuracy.

  • Day 3: Final QC, finishing, and packing for UPS expedited shipping.

Express Delivery

We shipped the sample via UPS Expedited, ensuring it reached the customer on time for their alumni marketing event.

Customer Outcome

  • Sample arrived before the deadline

  • Colors perfectly matched the school’s identity

  • Used immediately in marketing photos and alumni promotions

  • Customer plans to move forward with bulk orders

FAQ — Fast Sampling & Quick Reorder

3–7 days depending on the style and yarn availability.

Yes. We can develop samples from sketches, photos, or reference garments.

Yes, we support US, EU, UK, and Asian size standards.

If yarn is in stock, 2–3 weeks; with fresh yarn, about 3–4 weeks.

Jacquard, intarsia, and cable can still be sampled within 5–7 days.

Scroll to Top

TOP
China
Knitwear
Supplier

Custom Hoodie ,Cardigan , Sweater ,Dresses ,Tops ,Beanies

Custom Your Own Design With Us

  • Low MOQ ( startup 50 Units)
  • OEKO-TEX / GOTS Certification
  • Customization : labels, hangtags,packing
  • Lead Time :3~5 Days Sampling, 15 Days Bulk Prodution